Commercial construction in an existing building - Remodel

A SUCCESSFUL EXPANSION TO A COMMERCIAL PROJECT
(180 VOBB blocks were set in 2 hours or 90 blocks per hour by a do-it-yourselfer,
before adding the rebar and pouring/pumping concrete into the cavities)

This remodeling job already had some existing walls in which the VOBB block were fitted with no problem. Likewise, the floor was sloped to allow for drainage. Very simply, the bottom row of VOBB were shimmed and then grout poured into the cavities which filled to the floor. A very simple task and a very sturdy wall.

 interior of completed walls for a meat packing plant

Fill wall to separate the smoker (This is a meat packing plant subject to USDA regulations, etc.)

interior wall with Robert standing to add a view of the height of the wall - VOBB lintel

The lintel over the doorway was very easy to make with VOBB block.

Comments when the job was completed:
          "So simple . . . "
          "Built like a rock . . . "