pouring the foundation
1 2 3 4
5 6 7

 

start dry-stacking VOBB
8 9 10 11
12 13 14

 

15 The contractor must be on the job to be sure the building plans are followed.

16

17

18

19

20 Rub a piece of VOBB block on top of the VOBB on the pallet to be sure the tops have no ridges. Pull the VOBB off of the pallet. Do not lift the VOBB as the pulling also helps to make sure the VOBB blocks are smooth on the top.

21

22

23

24 VOBB is most impressed with this building contractor who knows he wants only quality.

25

26 Bulldozer is making her inspection to be sure the wall is built strong

27 Use shims when needed to get a level wall on a vertical basis.

28 The use of a string is very important to have a straight wall

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45 The Fennwood Estates subdivision in Walker

46

47

48

49

50

51

52

53

54

55

56

57 Front

58 A quality VOBB home for sale by the contractor

59

60 Exterior wall being stuccoed

61

62

63

64

65 Electrical wire coming out of the conduit in the VOBB block

66 Electrical wires ready for wiring.
Note: The wire is long enough to work with easily to make the connection.

67

68 Electrical control box

69 Exterior wall with brick ties nailed to the wall

70 Bathroom shower drain

(in-progress - more pictures to follow in the future)